Archives
All archived posts.
20254
May3
USV: Wi-Fi Control and Optimization
Development and optimization of USV Wi-Fi control.
USV: Assembly and Launch Test
USV assembly and the first launch test.
USV: Hardware and Bluetooth Control
USV hardware design and Bluetooth control development.
April1
USV: Hull Frame
Design and fabrication of the USV hull frame.